Main Contracting Commercial + Retail CONVRGNT HEAD OFFICE




Client: Convrgnt Value Engg LLC.
Completed: 2005
Construction Period: 12 months

Project Description:

This building consists to 90% of a recycled steel structure from a demolished building that was part of Dubai Airport. The steel structure was numbered piece by piece and bolt by bolt, dismantled and subsequently re-configured and re-built on site in the Al Quoz Industrial Area of Dubai.


Scope of Works

Architectural, MEP and Interior Design / Main Contractor / Steel erection

Features

The double height space at the core of the building held the airport’s customs baggage checking area. Six overhead projectors cast information and schedules from various divisions and teams onto the 24 x 7m high projection wall to ease inter-departmental collaboration and control.

At times, also cricket matches are streamed onto the screen.